SBTi Ongoing Emissions Responsibility (OER): the deadline that matters is the 2027 budget, not 2035

The obligation starts in 2035. Preparation starts now.

In June 2026 the SBTi, the most widely used standard for corporate climate targets, revised its Corporate Net-Zero Standard and introduced Ongoing Emissions Responsibility (OER). Most commentary focuses on the carbon removal obligation that starts in 2035. For Taiwanese companies the decisions come much earlier: target submissions under the new version open in February 2027, so the spending has to be thought through in the current budget round.

This page answers nine questions in about ten minutes. Clause references, worked calculations and the full reasoning are in the report Fulfilling Ongoing Emissions Responsibility (in Traditional Chinese, with an English abstract).

Last updated: 27 November 2026Based on: Fulfilling Ongoing Emissions Responsibility v1.0

Key points in thirty seconds

What is OER, and how much does it cover?

SBTi targets govern how fast a company's emissions come down. Until they reach net zero, though, a company keeps emitting every year; the new standard calls these ongoing emissions. OER asks companies to take responsibility for them.

There are two ways to do so: set a contribution budget that funds climate action, or obtain an equivalent volume of verified mitigation outcomes — in practice, carbon credits. How much a company covers depends on the tier it chooses:

TierEmissions coveredHow it is met
Engaged1% of five-year cumulative emissionsA budget (US$20 per tonne recommended, not mandated) or equivalent credits — either one
Advanced10% of five-year cumulative emissions, including all of scope 1 and 2US$20 per tonne, or equivalent credits — either one
Leadership100% of five-year cumulative emissions for Category A companiesUS$80 per tonne, used to obtain equivalent credits — both

Emissions here include scope 1 (direct), scope 2 (purchased electricity) and scope 3 (value chain). The most common misreading is the base: the 1% and 10% apply to the last five years of cumulative emissions, not to a single year. A company emitting 1 million tonnes a year that chooses Advanced covers 500,000 tonnes, not 100,000.

The US$20 and US$80 figures are budget benchmarks set by the SBTi. The standard itself says they are not market prices for credits, and that they will be reviewed periodically.

When does it start?

The new standard was published in June 2026, but it is not mandatory straight away. The old and new versions run side by side for a year:

WhenWhat happens
June 2026Corporate Net-Zero Standard V2.0 published
February 2027Target submissions under V2.0 open; V1.3.1 remains available
February 2028V2.0 only, mandatory
2035Carbon removal becomes required, rising year by year

Companies with targets already set under V1.3.1 can participate in OER from 2027, without waiting to switch versions. Postponing the assessment until the switch costs a full budget year.

The post-2035 requirements are labelled illustrative in the standard and will be reviewed against the best available science at the next major revision. The SBTi also plans to release interpretation guidance and other supporting documents between the fourth quarter of 2026 and 2027, and some details may change.

Is my company in scope?

There are two routes in. Not being registered with the SBTi does not mean the rules do not apply.

Route one: the company itself is in scope

The standard classifies Taiwan as a high-income economy. On that pathway, a company whose scope 1 and 2 emissions reach 10,000 tonnes is Category A, regardless of revenue. That is below the 25,000-tonne threshold of Taiwan's carbon fee, so some companies that pay no carbon fee fall under these international rules.

Size is judged on consolidated group figures, so setting a target through a subsidiary does not change the group's classification. Geography follows where the ultimate parent is registered, not where it operates.

Route two: the company's customers are in scope

This is the route most Taiwanese manufacturers will meet. A supplier's scope 1 emissions are its brand customer's scope 3. The standard lets a brand share scope 3 coverage responsibility with a partner that reports the same emissions, by written agreement. The text does not require the assuming partner to participate in the SBTi or to hold a target of its own.

The obligation is not the supplier's, but the negotiation will land on its desk. When a customer asks to share, three things matter:

  1. What is shared is responsibility, not credits. The party that assumes it still has to pay or deliver.
  2. Only scope 3 can be shared. Scope 1 and 2 cannot, and the arrangement must be written down and reported.
  3. Whether the assumed volume counts toward the assuming party's own tier is not yet settled. That decides whether sharing benefits both sides or is a pure cost, so contract terms should allow for it.

What is actually due in 2027?

At target submission, the only OER item is a statement of whether the company will participate. What is due in 2027 is a declaration that will be made public.

Not participating still has to be explained: the company submits written reasons and agrees to have its choice shown on the SBTi website within six months of target validation. The point of the design is to let peers be compared.

Cost estimates, purchasing and third-party assurance all fall at the end-of-cycle assessment, five years later. One cost comes earlier: participating companies must report a full scope 3 inventory every year. For a company that cannot yet do this, that internal investment arrives before any spending on credits.

How much will it cost compared with the carbon fee?

Start with the unit price. The Advanced tier's US$20 per tonne is about NT$637, below the lower end of the rate committee's benchmark for the post-2030 general carbon fee (NT$1,200 per tonne). Leadership's US$80 is about NT$2,547.

Similar unit prices do not mean similar bills, because the two measure different things:

Taiwan carbon feeSBTi OER
PeriodAnnualLast five years, cumulative
CoverageDirect emissions and purchased electricityPlus scope 3
ExemptionFirst 25,000 t per facilityNone

Take a manufacturer with 100,000 tonnes of scope 1 and 2 emissions and 900,000 tonnes of scope 3 a year. Its annual carbon fee at a preferential rate is about NT$7.5 million; an Advanced contribution budget averages about NT$63.7 million a year, more than eight times as much. Estimating OER from carbon fee figures understates it by at least an order of magnitude.

To run the numbers for your own company, request the OER cost calculator (Excel, in Chinese). For what the carbon fee actually costs per tonne, see the Carbon Pricing Record.

Do companies need to buy carbon removal?

Carbon removal becomes required from 2035, but preparation starts now.

Before 2035, removal is one option among several. Credits used for OER can come from three parallel sources: reductions outside the value chain, protecting and restoring natural sinks, and carbon removal. For companies that set a contribution budget, five of the six eligible uses have nothing to do with removal, among them research, adaptation and loss-and-damage funding.

After 2035 that changes. Eligible removals must cover part of ongoing emissions, and the share that must come from long-lived removals, which store carbon for centuries or longer, rises year by year. In the net-zero year, residual emissions of long-lived gases such as CO₂ must be neutralised entirely with long-lived removals.

The starting point is small and the slope is steep. Under the current text, a company emitting 100,000 tonnes a year needs about 90 tonnes of long-lived removals in 2035 and 90,000 tonnes by 2050, a thousandfold increase in fifteen years.

So the search cannot wait until 2035. Eligible removals must be delivered within the same reporting period as the emissions they cover, delivery often comes one to four years or more after contracting, and much of the high-quality durable supply is already contracted to large buyers through 2028–2030. Procurement has to be planned backward from the delivery date.

Can credits be bought now and held for later?

No. The problem is shelf life, not price. Three rules together close that route:

  1. No reuse. Outcomes already used for OER cannot be used again for post-2035 or net-zero requirements.
  2. Five-year window. Outcomes must have occurred within five years before the reporting year.
  3. Same-period delivery. Eligible removals must be delivered in the same reporting period as the emissions they cover.

Two different things often go under one word, “positioning”. A credit position is a stock held for future use; it has a shelf life and expires. A supply relationship means dealing with suppliers, knowing their capacity and delivery record, building up knowledge of contract terms, and being able to judge projects in-house. That does not expire.

This is not advice against buying. Credits needed for the current period should be bought as usual, and a small trial order placed to run internal processes once and test whether a supplier delivers is part of building the relationship.

Is qualifying durable removal available in Taiwan?

Not domestically. Taiwan's voluntary reduction methodologies cover only natural sinks such as afforestation, bamboo management and agricultural soils. Under the SBTi's definitions these are short-lived removals and cannot neutralise residual CO₂ emissions.

The gap is a missing category. Approaches that store carbon for centuries, such as biochar and carbon mineralisation, have no methodology under which they can be registered in Taiwan, so no qualifying units can be issued.

Responsibility can cross borders through a written agreement; supply cannot appear locally the same way. The gap affects two discussions that are usually held apart: companies preparing for target validation, and the state building a carbon removal framework. For how Taiwan could start, see A Ledger for Carbon Removal.

So what should companies do now?

Four decisions need to be taken separately. Merged into one, they lead to the opposite conclusion:

DecisionAnswerCommon misreading
Whether to declare participationA declaration is required. Non-participants submit written reasons, which are made public“We can wait and see”: silence is not an option
Whether to buy creditsDepends on tier and route. For companies meeting OER with verified outcomes, buying is required“No need to buy credits”: the text does not say so
Whether to buy carbon removalNot required before 2035, but planning works backward from delivery“Nothing to do yet”: preparation starts now
Whether to stockpile for 2035Not possible under the text“Buy while it's cheap”: the issue is shelf life

Suppliers face a fifth decision: whether, and on what terms, to accept a customer's request to share responsibility. That decision rests on understanding the four above.

What is worth investing in now are three things that no rule revision will make obsolete: scope 3 inventory capability, supplier relationships, and the in-house ability to judge carbon removal projects. Each takes years to build.

The next decision point is the 2027 budget. This page will be updated when the SBTi publishes its interpretation guidance.

Frequently asked questions

What is the SBTi's Ongoing Emissions Responsibility (OER)?

Ongoing Emissions Responsibility (OER) is a mechanism introduced in the SBTi Corporate Net-Zero Standard V2.0, published in June 2026. Targets govern how fast emissions come down; OER asks companies to take responsibility for the emissions they are still producing, either by setting a contribution budget for climate action or by obtaining an equivalent volume of verified mitigation outcomes, depending on the tier chosen. Participation is optional, but every company must state whether it will take part. Submissions under V2.0 open in February 2027, and V2.0 becomes mandatory in February 2028.

Is my company in scope of SBTi V2.0? What is the threshold?

Taiwan is classified as a high-income economy, so a company whose scope 1 and 2 emissions reach 10,000 tCO₂e is Category A regardless of revenue. That is below the 25,000 tCO₂e threshold of Taiwan's carbon fee. Size is judged on consolidated group figures, and geography on where the ultimate parent is registered. Companies outside scope can still be reached through their customers; see the next question.

Can suppliers without SBTi targets be affected?

Yes. A supplier's scope 1 is its brand customer's scope 3. The standard lets a company share scope 3 coverage responsibility with a value-chain partner that reports the same emissions, by written agreement, and does not require the assuming partner to participate in the SBTi itself. A Taiwanese supplier that has never dealt with the SBTi could receive a sharing request from 2027. What is shared is responsibility: the party that assumes it still has to pay or deliver.

Does SBTi V2.0 fully replace V1.3.1 on 1 January 2028?

No. Submissions under V2.0 open in February 2027, V1.3.1 remains available until 31 January 2028, and only V2.0 applies from February 2028. Companies with targets set under V1.3.1 can participate in OER from 2027 without waiting to switch versions.

Does OER require companies to buy carbon removals?

Not before 2035, but preparation starts now. Until then, removal is one of three parallel sources of eligible verified mitigation outcomes, alongside reductions outside the value chain and natural sinks, and five of the six categories a contribution budget may fund have nothing to do with removal. Eligible removals are required after 2035 and for neutralisation in the net-zero year. They must be delivered within the same reporting period as the emissions they cover, and much of the high-quality durable supply is already contracted through 2028–2030, so procurement planning has to work backward from the delivery date.

Do green power or renewable energy certificates count toward OER?

No. Energy certificates count toward target implementation; carbon credits count toward OER. The two tracks cannot be offset against each other, and their budgets cannot be swapped. OER coverage is calculated on physical emissions, with purchased electricity at the grid-average factor, so certificates do not reduce it.

How does the cost of OER compare with Taiwan's carbon fee?

Unit prices are comparable; totals differ by an order of magnitude. The Advanced tier's US$20 per tonne is about NT$637, below the lower end of the rate committee's benchmark for the post-2030 general rate. But the carbon fee is annual, has an exemption threshold and covers only direct emissions and purchased electricity, while OER is calculated on five years of cumulative emissions including scope 3, with no exemption. For a manufacturer with 100,000 t of scope 1 and 2 emissions and 900,000 t of scope 3 a year, the annual carbon fee is about NT$7.5 million; the Advanced contribution budget averages about NT$63.7 million a year.

Can credits be bought now and held for use after 2035?

No. Three rules close that route: outcomes already used for OER cannot be reused for post-2035 or net-zero requirements; outcomes must have occurred within five years of the reporting year; and eligible removals must be delivered in the same reporting period as the emissions they cover. Credits have a shelf life. Supplier relationships, and knowledge of suppliers' capacity and delivery record, do not. A small trial purchase made to run internal processes once is a different matter.

Is there durable carbon removal supply in Taiwan that meets the SBTi definition?

Not domestically. Taiwan's voluntary reduction methodologies cover only natural sinks such as afforestation, bamboo and agricultural soils, which fall under the SBTi's definition of short-lived removal, while residual emissions of long-lived gases such as CO₂ must be neutralised with long-lived removal. The gap is a missing category. Buying abroad runs into a different constraint: much of the good supply is already contracted to large buyers through around 2030.

Read more

If you wantRead
Clause references and calculations behind each pointFulfilling Ongoing Emissions Responsibility (24 chapters and 8 appendices in Chinese, English abstract; clause index in Appendix A)
A summary of all our research in EnglishResearch & Publications
A video explainer (in Chinese)Buying Green Power Isn't Enough: SBTi 2.0 and Ongoing Emissions Responsibility
What Taiwan's carbon fee actually costsCarbon Pricing Record

Author: Ming-Cheng Chiu (Sans Carbon) | ORCID 0009-0006-8418-0679

Based on the SBTi Corporate Net-Zero Standard V2.0 (June 2026). Exchange rate: Central Bank of the Republic of China (Taiwan) closing rate on 30 June 2026.

Disclosure: Sans Carbon works in carbon removal supply and is not neutral on this subject. This page and the report do not recommend any pathway, supplier or registry, and do not argue that companies should buy carbon removal now.

Licence: Creative Commons Attribution 4.0 (CC BY 4.0). You are welcome to republish and quote this page with attribution.